PPF logo

Bojana Embankment (SPASS#16)

Objectives:

  • preparation of Tender Documentation for Works and Supervision for the Detailed Design of Dyke Reconstruction on the Right Bank of Bojana River in Montenegro, prepared by a 3rd Party
  • Update the cost estimation
  • Elaborate a CBA
  • Expropriation Study/ Expropriation Elaborate

Output:

  • Tender Documentation for Works, including updated Cost Estimation, acc. to FIDIC Red Book, 1999 and EU PRAG
  • Tender Documentation for Supervision acc. to FIDIC Red Book, 1999 and EU PRAG
  • Annex to the Tender Documentations, respectively Technical Requirements, specifying the requirements of Construction due to the Habitats the Works shall be implemented (incl. applied Methodology)
  • CBA
  • Expropriation Elaborate