All required Activities concluded, as there were:
- Activity 1: Inception Stage
- Activity 2: Field Surveys
- Activity 3: Preparation of Technical Documentation (Detailed and Preliminary Design); including:
- Development of Detailed Design
- Hydraulic calculation/ modelling of River Crnja
- Option Analysis Report (on options for main collector routing)
- Development of Preliminary Design (PD) for the infrastructure connections to the WWTP
- Feasibility Study Update
- CBA Model Update
- Activity 4: Sludge Management Strategy
- Activity 5: Preparation of the EIA and ESIA Studies
- Activity 6: Preparation of TD, including Procurement Strategy and Grant Application Form
- Activity 7: TA to the Beneficiary during procurement process
An overview of deliverables is presented in the following Table.
| # | Topic | Deliverable |
| 1 | WW Transmission System and WWTP | Detailed and Preliminary Design |
| Hydraulic calculation/ modelling of River Crnja | ||
| Option Analysis Report | ||
| Feasibility Study, incl. CBA | ||
| Sludge Management Strategy | ||
| EIA Study | ||
| ESIA Study | ||
| Procurement Strategy | ||
| Grant Application Form | ||
| 2 | WW Transmission System and WWTP Works | Tender Documents (FIDIC Yellow Book) |
| 3 | Supervision | Tender Documents |