The following Activities were concluded:
- Activity 1: Inception Stage
- Activity 2: Field Surveys
- Activity 3: Preparation of Technical Documentation (Detailed and Preliminary Design); including:
- Development of Detailed Design of WW collection network
- Hydrotechnical design for part of the WW collection network
- Development of Preliminary design for pumping station and infrastructure facilities from pumping station to WWTP, WWTP connections
- Feasibility Study Update including updated CBA model
- Remaining DD for the additional part of the WW network (including hydrotechnical, mechanical, structural and electrotechnical design)
- PD including hydrotechnical, mechanical, structural, electrical, roads and traffic signalisation design
- Remaining DD for the additional part of the WW network (including hydrotechnical, mechanical, structural and electrotechnical design)
- Activity 4: Preparation of EIA Study – Final
- Activity 5: Procurement Strategy and Grant Application Form
- Activity 6: TA to the Beneficiary during procurement process
An overview of deliverables is presented in the following Table.
| # | Topic | Deliverable |
| 1 | WW Collection System, WWTP and WS Works | Detailed and Preliminary Design |
| Feasibility Study, incl. CBA | ||
| EIA Study | ||
| ESIA Study | ||
| Procurement Strategy | ||
| Grant Application Form | ||
| 2 | WW Collection System, WWTP and WS Works | Tender Documents (FIDIC Yellow Book) |
| 3 | Supervision | Tender Documents |