Kolašin Wastewater (WW.07)

The following Activities were concluded:

  • Activity 1:  Inception Stage
  • Activity 2:  Field Surveys
  • Activity 3:  Preparation of Technical Documentation (Detailed and Preliminary Design); including:
    • Development of Detailed Design of WW collection network
    • Hydrotechnical design for part of the WW collection network
    • Development of Preliminary design for pumping station and infrastructure facilities from pumping station to WWTP, WWTP connections
    • Feasibility Study Update including updated CBA model
      • Remaining DD for the additional part of the WW network (including hydrotechnical, mechanical, structural and electrotechnical design)
        • PD including hydrotechnical, mechanical, structural, electrical, roads and traffic signalisation design
  • Activity 4:  Preparation of EIA Study – Final
  • Activity 5:  Procurement Strategy and Grant Application Form
  • Activity 6:  TA to the Beneficiary during procurement process

An overview of deliverables is presented in the following Table.

#TopicDeliverable
1WW Collection System, WWTP and WS WorksDetailed and Preliminary Design
Feasibility Study, incl. CBA
EIA Study
ESIA Study
Procurement Strategy
Grant Application Form
2WW Collection System, WWTP and WS WorksTender Documents (FIDIC Yellow Book)
3SupervisionTender Documents