All required Activities concluded, as there were:
- Activity 1: Inception Stage
- Activity 2: Field Surveys[1]
- Activity 3: Preparation of Technical Documentation (Detailed and Preliminary Design):
- Development of Preliminary Design (PD) for WWTP Adaptation
- Feasibility Study and simplified CBA
- Activity 4: EIA/ Measures/ Plan – initiated and finalised
- Activity 5: Preparation of Procurement Documents
- Activity 6: Technical Assistance (to the Beneficiary during procurement process)
An overview of deliverables is presented in the following Table
| # | Topic | Deliverable |
| 1 | Sewerage network and WWTP rehabilitation | Preliminary Design for WWTP Adaptation |
| Feasibility Study | ||
| Environmental Management Plan | ||
| Procurement Strategy | ||
| Grant Application Form | ||
| 2 | Sewerage network and WWTP rehabilitation | Tender Documents (FIDIC Red Book) |
| 3 | Supervision | Tender Documents |
[1] Due to the scope of design (adaptation of the existing WWTP with no major structural elements) no geotechnical surveys have been conducted